Pick up is scheduled for 1/1/11.
Please stack trash in the south garage bay until it is emptied.
Wet Paint!
Painters are painting interior 1/15/21
Wet Conditions
Due to the rain the access to the back of the lot is muddy, please only access if absolutely necessary.
Homeowner Visit
Scheduled for 2/1/11
Please make sure the job site looks nice and there is access for the homeowners to view.
Wet Paint!
Painters are painting exterior 2/15/21
Lock the Door!
There has been theft in the area and we want to protect our homeowners investment. Lock up on your way out if you do not want to be held responsible for any losses.
All Existing Utility Connection Locations to be verified and coordinated with utility companies prior to connection and or digging
Provide Track out area at proposed construction entrance. Typical stabilized construction access 2″-3″ angular aggregate, 4″ thick above geotextile Fabric. Recommended minimum 20’0″ in length in direction of travel, flared at roadway or driveway.
All exterior wall framing to be 2×6 DP-L 16″ O.C. unless noted otherwise in engineering. All interior wall framing to be 2×4 DF-L 16″ O.C. unless noted otherwise in engineering.
Wood Connections: Unless noted otherwise in engineering H25A all room trusses and rafters to walls/beams unless noted otherwise.